| ISSUE | Date | Customer | Machine, Model, Serial No. | Problem | Progress | Executor | Status | Priority |
|---|---|---|---|---|---|---|---|---|
Dual Lane SMema has malfunction. [Delta 2] |
May 12, 2026 | Delta | AXI,TR7600 SIII, T2002770416-002 | The machine sent out PCB wrong lane (Dual Lane SMema). |
During follow-up troubleshooting guideline from RD team. |
June | open | MEDIUM |
Dual Lane SMema has malfunction. [Delta 2] |
May 19, 2026 | Delta | AXI,TR7600 SIII, T2002770416-002 | The machine sent out PCB wrong lane (Dual Lane SMema). |
- During follow-up troubleshooting guideline from RD team. - Plan to re-check wiring SMema again on 21'May'2026. |
June | on going | MEDIUM |
Dual Lane SMema has malfunction. [Delta 2] |
May 26, 2026 | Delta | AXI,TR7600 SIII, T2002770416-002 | The machine sent out PCB wrong lane (Dual Lane SMema). |
1.After check signal and wiring on 21'May'2026.found signal logic of previously machine(PASS=Open/FAIL=Short) which not matching with our AXI (PASS=Short/FAIL=Open) 2.Summary result to RD and continue follow-up. |
June | on going | MEDIUM |
Dual Lane SMema has malfunction. [Delta 2] |
June 5, 2026 | Delta | AXI,TR7600 SIII, T2002770416-002 | The machine sent out PCB wrong lane (Dual Lane SMema). |
1.RD request the PLC file. 2.Continue followup with RD. |
June | on going | MEDIUM |
Dual Lane SMema has malfunction. [Delta 2] |
June 10, 2026 | Delta | AXI,TR7600 SIII, T2002770416-002 | The machine sent out PCB wrong lane (Dual Lane SMema). |
1.RD request the PLC file. --> Already send to RD. 2.Require test upload & test PLC at line As11 |
June | on going | MEDIUM |
Dual Lane SMema has malfunction. [Delta 2] |
June 15, 2026 | Delta | AXI,TR7600 SIII, T2002770416-002 | The machine sent out PCB wrong lane (Dual Lane SMema). |
Require test upload & test PLC at line AS11 |
June | on going | MEDIUM |
Dual Lane SMema has malfunction. [Delta 2] |
June 25, 2026 | Delta | AXI,TR7600 SIII, T2002770416-002 | The machine sent out PCB wrong lane (Dual Lane SMema). |
Require test upload & test PLC at line AS10 (VPLC 2.16) Next : Continue followup with RD |
June | on going | MEDIUM |