Issues  WW34 — AOI 4

All AOI AXI ICT
Machine Issue Open date Customer Progress Executor Days Updated Status Priority
AOI AI verify host demo May 13, 2026 Chicony

6/5/2026 - Set up verify host pc and test run one machine. The AI verify host pc received data normally but the image is not showing. Already mailed to Taiwan wait to apply the solution

7/5/2026 - Apply the RS AI interface key to RS pc and change the module setting inside RS software from AI client to AI interface. the image is now display on the RSAI software. Only defect images can be displayed today, already sent an email to RD still waiting for solutions.

8/5/2026 - The path that RSAI pc read and the actual path is not the same, RD suggest to rename all RS pc to be different. If this solution does not work then have to modify the system file. Today have to connect both pre flow and post flow to the RSAI. Both Pre and Post reflow RS have been connected to the RSAI pc, the golden image can display normally and both golden and defect image can be save to the ai_image and ai_golden image folder.

11/5/2026 - Continue to collect the data from preflow and postflow AOI. Customer wants to set up AI at the other production line have to discuss futher(total 4 AOI machines 2 Preflow and 2 Postflow)

12/5/2026 - Monitor the data and check the AI report in SFC to compare the difference.

18/5/2026 - Get the AI report from SPC to make report for line 6. For line 5 have to gather more data. Send some of the training dataset to RD team to train model. AI accuracy for line 5 Pre and Post flow is at 76%. Wait for customer decision to turn on AI auto confirm.

25/5/2026 - Turn on AI auto confirm for all machine (AI accuracy around 76%-80%) wait to make report for both line

8/6/2026 - The AI defect rate is too high so have to send AI dataset for training.

11/6/2026 - Send training dataset to RD

15/6/2026 - RD team sent the update version of verify host software. Plan to go the install

19/6/2026 - Installed the upgraded version for the customer wait for result. If the AI defect looks good will make report and send to customer

29/6/2026 - After install AI defect rate is still high. Ask for solution from RD team

8/7/2026 - Install upgraded version of AI model and wait for feedback

16/7/2026 - Make draft report for new AI model

24/7/2026 - Finish report and send to P'Ton

27/7/2026 - Fix report according to P’Ton feedback

4/8/2026 - Fixing report

13/8/2026 - Wait to present to customer

Phone 99d Aug. 13, 2026 on going LOW
AOI AI verify host on SPI SPC July 10, 2026 NA

-With the parts to set up (Follow-up)
-Request the AI Verify System (License Key)(WW33)

Aek 41d Aug. 14, 2026 on going MED
AOI GRAB IMAGE ERROR July 13, 2026 NA

TR7007D T2002750835-004
Check log to verify problem.
Send camera cable to customer
Rrequest loan
Cable shipped to customer by hq
WTE replace cable but isuue still occurs
Request loan for image boards for confirmation.

Ryu 38d Aug. 19, 2026 on going MED
AOI Update window 10 TR7700 SII Plus July 17, 2026 NA

7/17: Discuss more detail and collect data, Bug report between WIN7 vs WIN10
7/20: Upload bug report from WIN7, WIN10 sent to R&D
7/24: R&D reply to only FM scanning difference.
8/4: Update status issue and waiting R&D reply
8/7: Adjusted parameter to save FM image and send bug report to RD

Nooknick 34d Aug. 13, 2026 on going MED